
On the day of the treatment, the team will locate the water tank that should be 80% drained and they will check appropriate operation for:
The client is to shut down the main incoming water valve 1 day before the treatment.
There will be water interruption during the treatment and the duration will be based on the tank size. The team will advise you accordingly.